We specialize in serving each unique business with a customized approach that creates solutions to their most significant pain points and commercial concerns.
Reach out to PC Inc regarding your energy problems.
2
We will schedule a field visit and request any built-in drawings of the facility.
3
Perform a consultation to gather more information about your unique needs.
4
Generate a scope of work, proposal, and payment schedule that works for you.
5
After you sign the contract, we consult with engineers on the best solutions for achieving your desired alternative energy source.
For example, a combination of generators, Uninterruptible Power Source (UPS), and solar energy. Perhaps an upgrade or addition of switchgear modifications.
6
Engineers draw plans to submit for state permits.
7
We apply for the proper permits and await approval. Sometimes this can take up to 6 months, depending on the project’s complexity.
8
Once the local building and planning jurisdiction approves the permit, we’ll issue POs for all the necessary equipment.
9
When we hear back on delivery times for equipment, we’ll develop a construction schedule to complete all necessary work before equipment arrival.
10
Once installation is complete, we perform function tests, warranty startup, and commissioning.
1
Reach out to PC Inc regarding your energy problems.
2
We will schedule a field visit and request any built-in drawings of the facility.
3
Perform a consultation to gather more information about your unique needs.
4
Generate a scope of work, proposal, and payment schedule that works for you.
5
After you sign the contract, we consult with engineers on the best solutions for achieving your desired alternative energy source.
For example, a combination of generators, Uninterruptible Power Source (UPS), and solar energy. Perhaps an upgrade or addition of switchgear modifications.
6
Engineers draw plans to submit for state permits.
7
We apply for the proper permits and await approval. Sometimes this can take up to 6 months, depending on the project’s complexity.
8
Once the local building and planning jurisdiction approves the permit, we’ll issue POs for all the necessary equipment.
9
When we hear back on delivery times for equipment, we’ll develop a construction schedule to complete all necessary work before equipment arrival.
10
Once installation is complete, we perform function tests, warranty startup, and commissioning.